Certification to BSI and UKCA standards.Fabrication of structures and components for structures up to 15 stories high using steel, aluminium and stainless steel.
Execution Class 2 requires welds to be completed to ±0.4mm on steel and ±0.0 on aluminium.Certification is for the full factory control procedure including procurement, processing, fabrication, storage, Q&A and delivery with documentation at every stage.Accuracy in pre engineered interfaces.
The level of the bespoke design in traditional projects makes it difficult to properly design every interface, leading to variability between interfaces on-site and the need for ad hoc changes.However, trades at different points in the process don’t necessarily have access to the early decision-making rationale, so there can be unanticipated consequences of these forced ad hoc changes.. For example, façade installers have reported that they spent 40% of their time undertaking site surveys and using shims and packers to fill in the gaps between their manufactured unitised systems and traditionally built superstructures.
This example is particularly pertinent given the crucial role façades play in fire stopping and compartmentation..
If the BSA onus is on ensuring the design doesn’t change from specification to delivery, then the exactness of the design and the tolerances is crucial..Because platform construction uses a limited number of components, it gives us a greater amount of control.
We’re able to limit the number of processes and operations which have to happen on site and we can control materials much more accurately.There are also considerable time-saving benefits with P-DfMA, which enable us to spend more time on the design and optimisation of components in the first place.
We put a tremendous amount of effort into component design because we know we’ll be using those same components again and again.Every gram of material you take out of the manufacturing process, out of each assembly process, has a massive multiplier effect in terms of material reduction.